




Wajer 38 S - Change Order
This Wajer 38 S in Aston Martin Sky Silver is a stunning Approved from this year. It has Sandstone upholstery and a custom two-person sofa behind the helmstation. “Change Order” has all the options you want on the Wajer 38 S with Fusion audio and lots of watertoys.
Colour
Aston Martin Sky Silver
Year
2026
Asking price
€895.000 ex VAT
Location
Heeg, Netherlands
Engine
2x Volvo Penta IPS 650
The Wajer 38 S puts you at the heart of the action with a central cockpit and hardtop , offering freedom to move, explore, and bring whatever you need—whether diving, surfing, fishing, or wakeboarding. Adventure is yours for the taking.
Explore the 38 S in detail


Loa
11.84m
38 feet
Beam
3.70m
12.2 feet
Draught
0.90m
3 feet
Weight
7.5 t (half load)
7.5 t (half load)
Engines
2x Volvo Penta IPS 650
2x Volvo Penta IPS 650
Top Speed
45 Knots (IPS 650)
45 Knots (IPS 650)
Cruising Speed
28 Knots (IPS 650)
28 Knots (IPS 650)
Range
300Nm
300Nm
Options

Sun awnings on fore- and aftdeck

In height adjustable table on foredeck

Custom made three-persons sofa
Details
Details and finishing
Custom colour in metallic paint deck & cockpit
Black ionized stainless steel deck fittings
Comfort
Fusion audio with 4 amplifiers, 8 speakers and 2 woofers
FLIR nightvision camera
Volvo Penta Dynamic Positioning System (DPS)
Bimini extension on front and aft with carbon poles
Set of Terry covers for upholstery
Highlights
Underwaterlights
Height adjustable table on foredeck
MCA classification cat. 3
Audio upgrade with 4 additional speakers and a subwoofer
Upgrade of Garmin screens to 2x 16"
Watertoys
1x Seabob F5S in hull color
2x Wajer branded, inflatable paddle boards

Quality assured
We check and service all pre-owned boats ourselves,
making sure they’re in mint condition for their next owner.
- 01
Checked and double-checked
This Wajer Approved yacht passed the 101-point checklist
- 02
Wajer experts only
All maintenance is carried out by our own technicians.
- 03
Full service history
Since we service our yachts ourselves, we know exactly what their story is.
The world of Wajer

Wajer Experiences
Meet up with owners and staff and enjoy everything Wajer.
Wajer Travel
Go on bespoke trips together with other Wajer owners.
Wajer Exchange
Sail other Wajer yachts when you visit other hubs, or while yours is being serviced.
